This machine is designed for the production of high-quality welded wire mesh with advanced automatic feeding and welding capabilities. And it adopts synchronous control technique, welding time and sub-control welding is composed of PLC program system. Touch screen and keyboard input panel forms make operation more intellectualized and reasonable.
Product Advantages
The biggest advantage of this system is that different mesh size can be welded on the same panel. New and high efficiency of welding machine transformer expands welding wire diameter scope. Easy handling and high flexibility and high working efficiency achieve a perfect welding machine.
Another advantage is that it has storage devices that can store about 1.5 tons of material, which enables automatic feeding of both warp and weft threads, truly reducing labor costs.
Product Usage
The welded mesh can be used in the fencing protect, floor wall reinforcing mesh in the building, reinforcing mesh in the tunnel, bridge and road.
Technique Parameter
MODEL | HWJ1200B | HWJ1500B | HWJ2000B | HWJ2500B |
Max mesh width | 1200mm | 1500mm | 2000mm | 2500mm |
Wire diameter | 3-6mm | 3-6mm | 3-6mm | 3-6mm |
Line wire spacing | 50-300mm | 50-300mm | 50-300mm | 50-300mm |
Cross wire spacing | 25-300mm | 25-300mm | 25-300mm | 25-300mm |
Mesh length | Max 6m | Max 6m | Max 6m | Max 6m |
Line wire type | By bars | By bars | By bars | By bars |
Cross wire type | By bars | By bars | By bars | By bars |
Welding speed | 80-100times/min | 80-100times/min | 80-100times/min | 80-100times/min |
Electric power | 160KVA*4 | 160KVA*5 | 160KVA*6 | 160KVA*8 |
01
Requirement Communication
We discussed the detaills for customer’s requirements including product specifications, functions, etc.
02
Scheme Design
According to customer needs, the company's design department provides a preliminary design plan and confirms it with the customer.
03
Technical Evaluation
The technical team conducts a feasibility evaluation of the plan to ensure that it meets production requirements and customer needs.
04
Contract Signing
After the two parties reach a consensus on the design plan, price, delivery date, etc., they sign a formal contract.
05
Manufacturing
The production department customizes the equipment according to the contract requirements to ensure quality and performance.
06
Quality Inspection
The quality inspection department conducts strict debugging and inspection of the finished equipment to ensure that it meets customer requirements.
07
Delivery Acceptance
After the customer's on-site/video debugging and acceptance is qualified, the product will be delivered and relevant operation guidance will be provided.
Related Products