CNC stirrup bender can automatically complete the straightening,lengthening, bending and cutting of steel wire, so that it can save time, labor and materials. With high processing precision and efficiency, it can realize fully automated, uninterrupted assembly line for steel wire processing. The machine is widely used in railways, highways bridges, real estate, large-scale wire processing plants and other fields.
Advantage
The CNC rebar bending machine has the characteristics of low equipment failure rate, fast bending speed of steel bars, low energy consumption without damaging the ribs, low noise and light vibration; it is efficient, applicable and reliable in operation. The operation is light and flexible.
Application
Mainly suitable for bending cold-rolled ribbed steel bars, hot-rolled third-grade steel bars, cold-rolled plain steel bars and hot-rolled round steel bars. The automatic bending machine has the characteristics of low equipment failure rate, fast bending speed of steel bars, low energy consumption without damaging the ribs, low noise and light vibration; it is efficient, applicable and reliable in operation. Two-person operation, light and flexible, 3-5 times faster than manual bending.
Machine Parameters
MODEL | GWG-10D | GWG-12C | GWG-14C | GWG-16B |
Single wire | 5-10ribbed | 6000mm | 6000mm | 4000mm |
5-12 plain | 50-500mm | 340-1000mm | 400-1200mm | |
Double wire | 5-8 ribbed | min0.1mm | min0.2mm | min0.2mm |
5-10 plain | 6-30r/min | 6-30r/min | 6-30r/min | |
Sizing accuracy(mm) | +1 | +1 | +1 | +1 |
Bending accuracy(°) | +1 | +1 | +1 | +1 |
Max traction speed(m/min) | 100 | 110 | 110 | 75 |
Max bending angle(°) | 135° single direction | 180° bidirectional | 180° bidirectional | 180° bidirectional |
Max bending speed(/sec) | 1000 | 1200 | 1200 | 1000 |
KWTotal power | 17 | 31.5 | 31.5 | 55.6 |
01
Requirement Communication
We discussed the detaills for customer’s requirements including product specifications, functions, etc.
02
Scheme Design
According to customer needs, the company's design department provides a preliminary design plan and confirms it with the customer.
03
Technical Evaluation
The technical team conducts a feasibility evaluation of the plan to ensure that it meets production requirements and customer needs.
04
Contract Signing
After the two parties reach a consensus on the design plan, price, delivery date, etc., they sign a formal contract.
05
Manufacturing
The production department customizes the equipment according to the contract requirements to ensure quality and performance.
06
Quality Inspection
The quality inspection department conducts strict debugging and inspection of the finished equipment to ensure that it meets customer requirements.
07
Delivery Acceptance
After the customer's on-site/video debugging and acceptance is qualified, the product will be delivered and relevant operation guidance will be provided.